GOVERNMENT PROJECTS
Other Government Projects
Bay County TPO
Client: DAG Architects
Location: Panama City, FL
SWFD Maint Building
Client: DAG Architects
Location: Santa Rosa Beach, FL
HG provided electrical engineering construction documents for a three story maintenance building, approximately 20,800 sq ft and a fire practice tower. This included design of a full building stand-by emergency generator and site lighting design.
City of Elba Power Line Relocation
Project
Client: CDG Engineers and Associates
Location: Elba, AL
HG provided electrical engineering construction documents for the relocation of power lines associated with Highway 125 Bypass construction.
St. Andrews State Park RV
Client: CPH
Location: Panama City, FL
HG provided electrical engineering construction documents for the upgrade of 174 Camp Sites from 30 amps to 50 amps, including new electrical infrastructure.
Dept of Labor - Kittrell Job Corps
Client: Watford Engineering
Location: Kittrell, NC
HG provided electrical drawings for a 8,500 sq ft facility which includes maintenance vocational program, facilities maintenance, and warehouse spaces. Design includes power, lighting control, fire alarm, and lightning protection. Lighting in maintenance and warehouse areas are energy-efficient LED source.
Fort Walton Beach Rec Center
Client: FWB
Location: Ft. Walton Beach, FL
HG engineers provided the electrical engineering design for a new 30,000 sq ft gymnasium and multi-function building and complete site to include five baseball fields and five softball fields, a mile walking sidewalk track and associated parking. The design includes typical power, lighting and fire alarm systems.
Bay Co. Juvenile Justice Courthouse
Client: Bay County
Location: Panama City, FL
HG provided the electrical and telecom design for a new juvenile justice facility including power distribution systems, lighting, computer room, generator backup, audio-visual systems, wireless area network tower to existing courthouse. Design included state of the art technology such as video conferencing for the judge and witness stand as well as a camera system to remotely monitor the evidence station. Electrical design also included the build out for a jail cell.
Smithsonian Software Study
Client: Williams Electric
Location: Washington D.C.
HG provided engineering support to develop and deliver a transition plan for the Smithsonian Software House C-Cure 800/8000 to 9000.
Breakfast Point Recreation
Client: DAG Architects
Location: Panama City Beach, FL
HG provided electrical engineering construction documents for approximately 7,400 total sq. ft. for restroom/concession, restroom/concession/press box, and restroom/entry pavilion buildings.
Santa Rosa County Courthouse
Client: Sam Marshall Architects
Location: Milton, FL
HG provided electrical engineering construction documents for the new $47.5 million courthouse, consisting of distribution power, lighting, mechanical equipment, power and fire alarm design.
Okaloosa County Courthouse
Client: Okaloosa County
Location: Crestview, FL
Okaloosa County Sheriff's Office
Client: DAG Architects
Location: Shalimar, FL
HG provided electrical engineering construction documents for the upgrade of 174 Camp Sites from 30 amps to 50 amps, including new electrical infrastructure.
PCB-GSA Border Protection & ICE
Client: PCB-GSA
Location: Panama City, FL
Pensacola Courthouse Office/Parking
Client: City of Pensacola
Location: Pensacola, FL
FWB Fire and Police Station
Client: Ft. Walton Beach
Location: Ft. Walton Beach, FL
FWB Field Office Complex
Client: Sam Marshall Architects
Location: Ft. Walton Beach, FL
HG provided electrical, site lighting, generator, and fire alarm engineering construction documents. Our design included power, lighting, mechanical power, and fire alarm services for three buildings totaling approximately 41,000 sq feet.
Captain Leonard Destin Park
Client: Wood and Partners
Location: Destin, FL
HG provided electrical engineering construction documents for Captain Leonard Destin Park, a $5 million park built in 2021.
Okaloosa County Administration
Building
Client: DAG Architects
Location: Shalimar, FL
HG provided engineering documents for the 63,653 sq ft, three story building and single story building for Board of Commissioners' offices and meeting room- Electrical: power distribution included existing generator and utility coordination; lighting to include site point-by-point and Board Room special lighting; Fire Alarm System; and Energy Code compliance.
Port of Panama City - New Crane
Client: Hatch Mott MacDonald
Location: Panama City, FL
HG designed and commissioned the 12.47kV protection and control systems for the new Mobile Harbour Crane. The protection and controls inlcude a 15kV breaker with Schweitzer Engineering Labs (SEL) microprocessor based relaying overcurrent and fault protection, a ground monitor personnel protection system and a kirk key mechanical interlock system.
City of Dothan - Two Libraries
Client: City of Dothan
Location: Dothan, AL
Escambia County Courthouse Office
Client: Escambia County
Location: Pensacola, FL
Franklin County Park
Client: VBA Designs
Location: Apalachicola, FL
HG provided electrical engineering construction documents for the renovation of existing building for education center, museum, a new pavilion and parking area for an education center.